Project Planning, Stakeholder Involvement, Risk Management, and Project Success - A Case of Selected NGOs in South Sudan

Download Article

DOI: 10.21522/TIJMG.2015.09.01.Art001

Authors : Amule Robert Elly

Abstract:

Despite the huge inflow of billions of donors into the country for humanitarian and development programs, South Sudan communities have remained vulnerable to natural and humanmade disasters, this has resulted into massive poverty, loss of human lives and property, and internal and cross border displacements as the best coping options. This study was aimed at investigating the factors perceived to influence NGOs projects’ success in saving lives and restoring the human dignity of the most vulnerable populations in the Country. These factors studied include Project planning, stakeholder involvement, and Risk Management. The study employed both quantitative and qualitative approaches for data collection through a sample size of 144 respondents, selected from 233 sample frames of NGOs’ staff in South Sudan. The sample size was determined by Krejcie Robert V. Morgan W. (1970) table). The study findings show positive relationships between the independent variables and the dependent variable as follows; Project Planning and Projects Success at (r = 0.348, P-value < 0.01); Project Planning and Risk management at (r = 0.528, P-value < 0.01); Risk management and Projects success at (r = 0.523, P-value < 0.01); Stakeholder’s involvement and Risk management at (r = 0.503, P-value < 0.01); and A Regression analysis of (R = 0.541). Therefore, in consideration of the positive correlations’ independent variable, NGOs are advised to ensure sufficient project planning, risk management, and stakeholders’ involvement; to ascertain intervention success.

Keywords: Project Planning, Stakeholder Involvement, Risk Management and Project success.

References:

[1] Werker, E. & Ahmed, F. (2008). What do NGOs do? Journal of Economic Perspectives, 22(2), 73-92.

[2] World Congress of NGOs Report, (2009); Enhancing Human Dignity - The Role of NGO’s.

[3] Riddell, R.C. and Robinson, M. 1995. Non-Governmental Organizations and Rural development. London: Clarendon Press.

[4] Universal Declaration of Human Rights, (1948); Adopted by United Nations General Assembly that enshrines the rights and freedoms of all human beings. https://en.wikipedia.org/wiki/Universal_Declaration_of_Human_Rights.

[5] Kaldor et al. 2012: 19, growth of NGOs in last few decades in Africa and Globally.

[6] Keane, (2003:5). Global Civil Society. Cambridge: Cambridge University Press.

[7] Dr. Luka Biong Deng Kuol et al, (2017); At the root of exodus: Food security, conflict, and international migration.

[8] United Nations’ Office for Coordination of Humanitarian Affairs (UN OCHA), (2010); Situation report. https://reliefweb.int/sites/reliefweb.int/files/resources/FDECE660F3DD858CC12576E7003E8187-Full_Report.pdf.

[9] United Nation’s World food programme in South Sudan (WFP 2018), UN agencies and non-governmental organizations support.

[10] UNOCHA (2018), multilateral donors for South Sudan.

[11] Zhou, Zhang, & Wang, (2007); Understanding the Key Risks in Construction Projects in China. International Journal of Project Management, 25, 601-614. http://dx.doi.org/10.1016/j.ijproman.2007.03.001.

[12] Hekala, W. (2012). Why donors should care more about project management. Retrieved from http://www.devex.com/en/news/why-donors-should-care-more-about-project/77595.

[13] Dugger, C.W. (2007), World Bank agency finds its Africa projects are lagging. Retrieved http://www.nytimes.com/2007/08/02/world/africa/02worldbank.html?_r=0.

[14] Faniran, Oluwoye and Lenard (1998), Interactions between Construction Planning and influence factors. Journal of Construction Engineering and Management, 124(4), 245-256.

[15] Pinto & Slevin (1989); Critical Success Factors in R&D Projects, Research-Technology Management, 32:1, 31-35, DOI:

[16] Habegger (2008), risk being predestined and subject to human agency.

[17] Rosa (2003), the concepts and elements of uncertainty.

[18] Lenard, (2008). Trust Your Compatriots, but Count Your Change: The Roles of Trust, Mistrust and Distrust in Democracy. Polit. Stud. 56 (2), 312–332.

[19] Freeman (1981), “Strategic Management: A stakeholder Approach”, Advances in Strategic Management. Also, Pitman 1984.

[20] Argenti J (1993), Your organization; what is it for? McGrew Hill, New York.

[21] Webster M. (1983). Collegiate Dictionary. Britannica Company.

[22] Terje Aven & Ortwin Renn, 2009. “The Role of Quantitative Risk Assessments for Characterizing Risk and Uncertainty and Delineating Appropriate Risk Management Options, with Special Emphasis on Terrorism Risk,” Risk Analysis, John Wiley & Sons, vol. 29(4), pages 587-600.

[23] Ward, et al. (2007) Rehabilitation: Beyond the risk paradigm. London. Routledge.

[24] Hillson D. A. (ed) (2006). The Risk Management Universe: A Guided Tour. London, UK: British Standards Institution.

[25] Padovani, R., and Tugnoli, A., (2005), L`Enterprise Risk Management Nelle Imprese Non Finanziarie: Aspetti Teorici e Studi Di Caso Nel Mercato Italiano. Politecnico Di Milano, Facolta Di Ingegneria Dei Sistemi.

[26] Knight, F. (1921). Risk, Uncertainty and Profit. New York: Harper and Row.

[27] Adams, (2005) in Hermans et al., 2012). Archer M.S. (1995); Cuellar, M.J. (2010b). Using Realist Social Theory to Explain Project outcomes. International Journal on IT Project Management, 1(4), 38-51.

[28] Archer, et al, (1995). Realist social theory: The morphogenetic approach. Cambridge: Cambridge University Press Archer, M. S. (1995). Realist social theory: The morphogenetic approach. Cambridge: Cambridge University Press.

[29] Creswell (2013), the behaviour respondents.

[30] Ulmer and Wilson 2003, triangulation of different learning from research.

[31] Larsen & Myers’ (1997). BPR Success or Failure? A Business Process Reengineering Project in the financial services Industry. Paper Presented at the Eighteenth International Conference on Information Systems.

[32] Shenhar and Dvir (2007) extend Turner’s (1999) model, Table 2. They identify five categories of project success; efficiency; impact on the team; impact on the customer; business success & preparing for the future.

[33] Arasa & K’Obonyo, P. et al, (2012). The Relationship between Strategic Planning and Firm Performance [Special Issue]. International Journal of Humanities and Social Science, 2 (22), 71-93.

[34] De Wit, A. (1988). Measurement of Project Success. International Journal of Project Management Vol. 6.

[35] Cooke & Davies, et al. (2009). Project management systems: Moving project management from an operational to a strategic discipline. Project Management Journal, 40(1), 110-123.

[36] Karabulut. (2010). The effects of low-intensity resistance training with vascular restriction on leg muscle strength in older men. European Journal of Applied Physiology.

[37] Zandi, & Naysay et al, (2013).”The Behavioral Intention of Malaysian Students toward Accounting Discipline,” Journal of Accounting and Management Information Systems, Faculty of Accounting and Management Information Systems, The Bucharest University of Economic Studies, vol. 12(3), pages 471-488, September.

[38] Abdifatah & Ogle (2010); A comparative analysis of credit risk management practices of Islamic and conventional Banks in Kenya.

[39] Shahu et al., 2013; Engineering Properties of Copper Slag–Fly Ash–Dolime Mix and Its Utilization in the Base Course of Flexible Pavements.

[40] Doloi et al., 2012, Doloi, 2013; Empirical Analysis of Traditional Contracting and Relationship Agreements for Procuring Partners in Construction Projects.